The Challenge:

The project faced multiple procurement issues which pushed the project from the summer months into the winter months. During this time frame the dam froze which prevented W-T from accessing the isolation valves.

Our Solution:

Aegis was able to assist the team by developing time impact analysis which resulted in multiple time extensions to the project.